Lrd Bachelors Ave over Br S Fk Eau Claire River
FairClark County, Wisconsin · 2.1M S JCT Cth N · Structure no. P10010400000000
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected September 2024
- Type
- Channel Beam
- Prestressed Concrete
- Length
- 41 ft
- 1 main span
- Daily traffic
- 58
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Bachelors Ave over Br S Fk Eau Claire River is a prestressed concrete channel beam carrying Lrd Bachelors Ave over Br S Fk Eau Claire River in Clark County, Wisconsin. It was built in 1961, so it is 64 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 58 vehicles a day, projected to reach 63 by 2043. The structure is 41 ft (12.5 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Bachelors Ave over Br S Fk Eau Claire River built?
It was built in 1961, making it 64 years old in 2025.
What condition is Lrd Bachelors Ave over Br S Fk Eau Claire River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Lrd Bachelors Ave over Br S Fk Eau Claire River carry?
About 58 vehicles per day (2022 count).
How long is Lrd Bachelors Ave over Br S Fk Eau Claire River?
The structure is 41 ft (12.5 m) long with a longest span of 39 ft (11.9 m) and a deck 25 ft wide.
Who owns Lrd Bachelors Ave over Br S Fk Eau Claire River?
It is owned by the Town or Township Highway Agency.