Cth N over South Fork Eau Claire Ri
GoodClark County, Wisconsin · 4.7 Miles E of Junction W · Structure no. B10038700000000
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 124 ft
- 2 main spans
- Daily traffic
- 580
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Cth N over South Fork Eau Claire Ri is a prestressed concrete continuous stringer/multi-beam or girder carrying Cth N over South Fork Eau Claire Ri in Clark County, Wisconsin. It was built in 2023, so it is 2 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 580 vehicles a day, roughly 5% of them trucks, projected to reach 640 by 2042. The structure is 124 ft (37.9 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cth N over South Fork Eau Claire Ri built?
It was built in 2023, making it 2 years old in 2025.
What condition is Cth N over South Fork Eau Claire Ri in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Cth N over South Fork Eau Claire Ri carry?
About 580 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Cth N over South Fork Eau Claire Ri?
The structure is 124 ft (37.9 m) long with a longest span of 61 ft (18.6 m) and a deck 32 ft wide.
Who owns Cth N over South Fork Eau Claire Ri?
It is owned by the Town or Township Highway Agency.