US Bridges

IH 41 SB over Lrd Oneida ST EB

Good

Brown County, Wisconsin · 1.3 MI N JCT Main Ave · Structure no. B05061800000000

Built
2016
9 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
220 ft
2 main spans
Daily traffic
37,300
2023 count
Owner
State
State Highway Agency

About this bridge

IH 41 SB over Lrd Oneida ST EB is a prestressed concrete stringer/multi-beam or girder carrying IH 41 SB over Lrd Oneida ST EB in Brown County, Wisconsin. It was built in 2016, so it is 9 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 37,300 vehicles a day, projected to reach 42,636 by 2042. The structure is 220 ft (67.2 m) long and 80 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIH 41 SB
CrossesLrd Oneida ST EB
Location1.3 MI N JCT Main Ave
RouteInterstate 41
Coordinates44.46965, -88.07964
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating41.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length220 ft (67.2 m)
Longest span108 ft (32.9 m)
Deck width80 ft (24.3 m)
Roadway width77 ft (23.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,300 (2023)
Projected traffic42,636 by 2042
Trucks0%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 41 SB over Lrd Oneida ST EB built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH 41 SB over Lrd Oneida ST EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does IH 41 SB over Lrd Oneida ST EB carry?

About 37,300 vehicles per day (2023 count).

How long is IH 41 SB over Lrd Oneida ST EB?

The structure is 220 ft (67.2 m) long with a longest span of 108 ft (32.9 m) and a deck 80 ft wide.

Who owns IH 41 SB over Lrd Oneida ST EB?

It is owned by the State Highway Agency.