IH 41 NB Ramp over Lrd Oneida Street
GoodBrown County, Wisconsin · At Oneida St. · Structure no. B05061200000000
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 218 ft
- 2 main spans
- Daily traffic
- 29,650
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 41 NB Ramp over Lrd Oneida Street is a prestressed concrete stringer/multi-beam or girder carrying IH 41 NB Ramp over Lrd Oneida Street in Brown County, Wisconsin. It was built in 2014, so it is 11 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 29,650 vehicles a day, projected to reach 33,801 by 2042. The structure is 218 ft (66.4 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 41 NB Ramp over Lrd Oneida Street built?
It was built in 2014, making it 11 years old in 2025.
What condition is IH 41 NB Ramp over Lrd Oneida Street in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does IH 41 NB Ramp over Lrd Oneida Street carry?
About 29,650 vehicles per day (2023 count).
How long is IH 41 NB Ramp over Lrd Oneida Street?
The structure is 218 ft (66.4 m) long with a longest span of 107 ft (32.5 m) and a deck 42 ft wide.
Who owns IH 41 NB Ramp over Lrd Oneida Street?
It is owned by the State Highway Agency.