US Bridges

IH 41 over Ashwaubenon CR

Good

Brown County, Wisconsin · At Ashwaubenon Creek · Structure no. B05061300000000

Built
2012
13 years old
Condition
Good
inspected October 2023
Type
Tee Beam
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
74,600
2023 count
Owner
State
State Highway Agency

About this bridge

IH 41 over Ashwaubenon CR is a prestressed concrete tee beam carrying IH 41 over Ashwaubenon CR in Brown County, Wisconsin. It was built in 2012, so it is 13 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 74,600 vehicles a day, projected to reach 90,500 by 2042. The structure is 60 ft (18.3 m) long and 294 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIH 41
CrossesAshwaubenon CR
LocationAt Ashwaubenon Creek
RouteInterstate 41
Coordinates44.45664, -88.08675
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.3 US tons
Inventory rating40 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span55 ft (16.8 m)
Deck width294 ft (89.7 m)
Roadway width292 ft (89.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic74,600 (2023)
Projected traffic90,500 by 2042
Trucks0%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 41 over Ashwaubenon CR built?

It was built in 2012, making it 13 years old in 2025.

What condition is IH 41 over Ashwaubenon CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does IH 41 over Ashwaubenon CR carry?

About 74,600 vehicles per day (2023 count).

How long is IH 41 over Ashwaubenon CR?

The structure is 60 ft (18.3 m) long with a longest span of 55 ft (16.8 m) and a deck 294 ft wide.

Who owns IH 41 over Ashwaubenon CR?

It is owned by the State Highway Agency.