US Bridges

IH 41SB on Ramp FR over Cth G

Good

Brown County, Wisconsin · 2.3M S Jcth Sth 172 · Structure no. B05061000000000

Built
2012
13 years old, rebuilt 2013
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
149 ft
2 main spans
Daily traffic
10,200
2021 count
Owner
State
State Highway Agency

About this bridge

IH 41SB on Ramp FR over Cth G is a prestressed concrete continuous stringer/multi-beam or girder carrying IH 41SB on Ramp FR over Cth G in Brown County, Wisconsin. It was built in 2012 and reconstructed in 2013, so it is 13 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,200 vehicles a day, projected to reach 7,500 by 2042. The structure is 149 ft (45.3 m) long and 54 ft wide.

CarriesIH 41SB on Ramp FR
CrossesCth G
Location2.3M S Jcth Sth 172
RouteInterstate 41
Coordinates44.45313, -88.09023
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.5 US tons
Inventory rating30 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length149 ft (45.3 m)
Longest span83 ft (25.3 m)
Deck width54 ft (16.6 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,200 (2021)
Projected traffic7,500 by 2042
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 41SB on Ramp FR over Cth G built?

It was built in 2012, making it 13 years old in 2025. It was reconstructed in 2013.

What condition is IH 41SB on Ramp FR over Cth G in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does IH 41SB on Ramp FR over Cth G carry?

About 10,200 vehicles per day (2021 count).

How long is IH 41SB on Ramp FR over Cth G?

The structure is 149 ft (45.3 m) long with a longest span of 83 ft (25.3 m) and a deck 54 ft wide.

Who owns IH 41SB on Ramp FR over Cth G?

It is owned by the State Highway Agency.