US Bridges

Pioneer Way over Cowiche Creek

Good

Yakima County, Washington · .04 South of Cowiche Mill · Structure no. 088700000000000

Built
2014
11 years old
Condition
Good
inspected December 2022
Type
Tee Beam
Prestressed Concrete
Length
82 ft
1 main span
Daily traffic
180
2022 count
Owner
County
County Highway Agency

About this bridge

Pioneer Way over Cowiche Creek is a prestressed concrete tee beam carrying Pioneer Way over Cowiche Creek in Yakima County, Washington. It was built in 2014, so it is 11 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 180 vehicles a day, roughly 10% of them trucks, projected to reach 195 by 2042. The structure is 82 ft (25 m) long and 34 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPioneer Way
CrossesCowiche Creek
Location.04 South of Cowiche Mill
RouteCounty Highway 24350
Coordinates46.65402, -120.72035
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating42.9 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length82 ft (25 m)
Longest span80 ft (24.4 m)
Deck width34 ft (10.5 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic180 (2022)
Projected traffic195 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$3.3 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Pioneer Way over Cowiche Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is Pioneer Way over Cowiche Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does Pioneer Way over Cowiche Creek carry?

About 180 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Pioneer Way over Cowiche Creek?

The structure is 82 ft (25 m) long with a longest span of 80 ft (24.4 m) and a deck 34 ft wide.

Who owns Pioneer Way over Cowiche Creek?

It is owned by the County Highway Agency.