Good

Yakima County, Washington · 0.08 W of Bridgeman · Structure no. 086569000000000

Built
2001
24 years old
Condition
Good
inspected November 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
74 ft
1 main span
Daily traffic
465
2020 count
Owner
County
County Highway Agency

About this bridge

Edison RD E. over Svid Canal is a prestressed concrete stringer/multi-beam or girder carrying Edison RD E. over Svid Canal in Yakima County, Washington. It was built in 2001, so it is 24 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 465 vehicles a day, roughly 5% of them trucks, projected to reach 550 by 2020. The structure is 74 ft (22.6 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesEdison RD E.
CrossesSvid Canal
Location0.08 W of Bridgeman
RouteCounty Highway 62700
Coordinates46.32444, -119.93883
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.8 US tons
Inventory rating27.4 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length74 ft (22.6 m)
Longest span72 ft (21.9 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic465 (2020)
Projected traffic550 by 2020
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$3 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Edison RD E. over Svid Canal built?

It was built in 2001, making it 24 years old in 2025.

What condition is Edison RD E. over Svid Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does Edison RD E. over Svid Canal carry?

About 465 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Edison RD E. over Svid Canal?

The structure is 74 ft (22.6 m) long with a longest span of 72 ft (21.9 m) and a deck 32 ft wide.

Who owns Edison RD E. over Svid Canal?

It is owned by the County Highway Agency.