US Bridges

Roza Dr. over Svid Canal

Good

Yakima County, Washington · 0.01 S of Schooley · Structure no. 086492000000000

Built
2000
25 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
84 ft
1 main span
Daily traffic
991
2023 count
Owner
County
County Highway Agency

About this bridge

Roza Dr. over Svid Canal is a prestressed concrete stringer/multi-beam or girder carrying Roza Dr. over Svid Canal in Yakima County, Washington. It was built in 2000, so it is 25 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 991 vehicles a day, roughly 5% of them trucks, projected to reach 980 by 2043. The structure is 84 ft (25.6 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoza Dr.
CrossesSvid Canal
Location0.01 S of Schooley
RouteCounty Highway 67350
Coordinates46.41987, -120.26206
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating28.2 US tons
Inventory rating13.6 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length84 ft (25.6 m)
Longest span82 ft (25 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic991 (2023)
Projected traffic980 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$3.4 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Roza Dr. over Svid Canal built?

It was built in 2000, making it 25 years old in 2025.

What condition is Roza Dr. over Svid Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Roza Dr. over Svid Canal carry?

About 991 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Roza Dr. over Svid Canal?

The structure is 84 ft (25.6 m) long with a longest span of 82 ft (25 m) and a deck 32 ft wide.

Who owns Roza Dr. over Svid Canal?

It is owned by the County Highway Agency.