Holaday Road over Sulpher Creek Wasteway
GoodPosted for loadYakima County, Washington · 00.02 E Midvale RD · Structure no. 083214000000000
- Built
- 1978
- 47 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 97 ft
- 1 main span
- Daily traffic
- 31
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Holaday Road over Sulpher Creek Wasteway is a prestressed concrete stringer/multi-beam or girder carrying Holaday Road over Sulpher Creek Wasteway in Yakima County, Washington. It was built in 1978, so it is 47 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 31 vehicles a day, roughly 5% of them trucks, projected to reach 165 by 2043. The structure is 97 ft (29.6 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Holaday Road over Sulpher Creek Wasteway built?
It was built in 1978, making it 47 years old in 2025.
What condition is Holaday Road over Sulpher Creek Wasteway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Holaday Road over Sulpher Creek Wasteway carry?
About 31 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Holaday Road over Sulpher Creek Wasteway?
The structure is 97 ft (29.6 m) long with a longest span of 96 ft (29.3 m) and a deck 32 ft wide.
Who owns Holaday Road over Sulpher Creek Wasteway?
It is owned by the County Highway Agency.