US Bridges

Tieton Reservoir over Tieton River S. Fork

Good

Yakima County, Washington · 0.41 E Fs RD 1000 · Structure no. 080696000000000

Built
1986
39 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
1 main span
Daily traffic
550
2019 count
Owner
County
County Highway Agency

About this bridge

Tieton Reservoir over Tieton River S. Fork is a prestressed concrete stringer/multi-beam or girder carrying Tieton Reservoir over Tieton River S. Fork in Yakima County, Washington. It was built in 1986, so it is 39 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 550 vehicles a day, roughly 20% of them trucks, projected to reach 800 by 2039. The structure is 120 ft (36.6 m) long and 31 ft wide. If it were closed, the detour would be 24.9 mi (40 km).

CarriesTieton Reservoir
CrossesTieton River S. Fork
Location0.41 E Fs RD 1000
RouteCounty Highway 20060
Coordinates46.62833, -121.13333
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating38.6 US tons
Inventory rating30 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span117 ft (35.7 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2019)
Projected traffic800 by 2039
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$4.7 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Tieton Reservoir over Tieton River S. Fork built?

It was built in 1986, making it 39 years old in 2025.

What condition is Tieton Reservoir over Tieton River S. Fork in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Tieton Reservoir over Tieton River S. Fork carry?

About 550 vehicles per day (2019 count), of which roughly 20% are trucks.

How long is Tieton Reservoir over Tieton River S. Fork?

The structure is 120 ft (36.6 m) long with a longest span of 117 ft (35.7 m) and a deck 31 ft wide.

Who owns Tieton Reservoir over Tieton River S. Fork?

It is owned by the County Highway Agency.