US Bridges

Pioneer Way N. over Cowiche Creek

Good

Yakima County, Washington · 00.01 S Mahoney RD · Structure no. 080078000000000

Built
1987
38 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
235
2020 count
Owner
County
County Highway Agency

About this bridge

Pioneer Way N. over Cowiche Creek is a prestressed concrete stringer/multi-beam or girder carrying Pioneer Way N. over Cowiche Creek in Yakima County, Washington. It was built in 1987, so it is 38 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 235 vehicles a day, roughly 5% of them trucks, projected to reach 259 by 2040. The structure is 40 ft (12.2 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesPioneer Way N.
CrossesCowiche Creek
Location00.01 S Mahoney RD
RouteCounty Highway 20200
Coordinates46.64667, -120.68167
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic235 (2020)
Projected traffic259 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.8 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Pioneer Way N. over Cowiche Creek built?

It was built in 1987, making it 38 years old in 2025.

What condition is Pioneer Way N. over Cowiche Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Pioneer Way N. over Cowiche Creek carry?

About 235 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Pioneer Way N. over Cowiche Creek?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 32 ft wide.

Who owns Pioneer Way N. over Cowiche Creek?

It is owned by the County Highway Agency.