Roeder Ave over Whatcom Creek/Waterway
FairWhatcom County, Washington · At JCT Central Ave · Structure no. 086181000000000
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 500 ft
- 5 main spans
- Daily traffic
- 7,800
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Roeder Ave over Whatcom Creek/Waterway is a prestressed concrete continuous stringer/multi-beam or girder carrying Roeder Ave over Whatcom Creek/Waterway in Whatcom County, Washington. It was built in 1995, so it is 30 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,800 vehicles a day, roughly 5% of them trucks, projected to reach 10,200 by 2043. The structure is 500 ft (152.4 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Roeder Ave over Whatcom Creek/Waterway built?
It was built in 1995, making it 30 years old in 2025.
What condition is Roeder Ave over Whatcom Creek/Waterway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Roeder Ave over Whatcom Creek/Waterway carry?
About 7,800 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is Roeder Ave over Whatcom Creek/Waterway?
The structure is 500 ft (152.4 m) long with a longest span of 84 ft (25.6 m) and a deck 45 ft wide.
Who owns Roeder Ave over Whatcom Creek/Waterway?
It is owned by the City or Municipal Highway Agency.