Meadows Road over Overflow Channel
GoodThurston County, Washington · 0.1 M SW of Prather RD · Structure no. 086189000000000
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 208 ft
- 3 main spans
- Daily traffic
- 12
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Meadows Road over Overflow Channel is a prestressed concrete continuous stringer/multi-beam or girder carrying Meadows Road over Overflow Channel in Thurston County, Washington. It was built in 1995, so it is 30 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12 vehicles a day, roughly 10% of them trucks, projected to reach 18 by 2041. The structure is 208 ft (63.4 m) long and 18 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Meadows Road over Overflow Channel built?
It was built in 1995, making it 30 years old in 2025.
What condition is Meadows Road over Overflow Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Meadows Road over Overflow Channel carry?
About 12 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Meadows Road over Overflow Channel?
The structure is 208 ft (63.4 m) long with a longest span of 69 ft (21 m) and a deck 18 ft wide.
Who owns Meadows Road over Overflow Channel?
It is owned by the County Highway Agency.