SR 20 over Ship Hbr/Guemes Channel
FairPosted for loadSkagit County, Washington · 7.8N on SR20 Spur · Structure no. 0008985D0000000
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 158 ft
- 10 main spans
- Daily traffic
- 3,227
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
SR 20 over Ship Hbr/Guemes Channel is a wood or timber stringer/multi-beam or girder carrying SR 20 over Ship Hbr/Guemes Channel in Skagit County, Washington. It was built in 1959, so it is 66 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 3,227 vehicles a day, roughly 2% of them trucks, projected to reach 5,576 by 2036. The structure is 158 ft (48.2 m) long and 50 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 20 over Ship Hbr/Guemes Channel built?
It was built in 1959, making it 66 years old in 2025.
What condition is SR 20 over Ship Hbr/Guemes Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR 20 over Ship Hbr/Guemes Channel carry?
About 3,227 vehicles per day (2010 count), of which roughly 2% are trucks.
How long is SR 20 over Ship Hbr/Guemes Channel?
The structure is 158 ft (48.2 m) long with a longest span of 19 ft (5.8 m) and a deck 50 ft wide.
Who owns SR 20 over Ship Hbr/Guemes Channel?
It is owned by the State Highway Agency.