Extension of SR 20 over Upright Channel
FairSan Juan County, Washington · N End Lopez Island · Structure no. 0012015A0000000
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected September 2024
- Type
- Movable - Lift
- Steel
- Length
- 105 ft
- 1 main span
- Daily traffic
- 1,349
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
Extension of SR 20 over Upright Channel is a steel movable - lift carrying Extension of SR 20 over Upright Channel in San Juan County, Washington. It was built in 1981, so it is 44 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,349 vehicles a day, roughly 1% of them trucks, projected to reach 2,331 by 2036. The structure is 105 ft (32 m) long and 24 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Extension of SR 20 over Upright Channel built?
It was built in 1981, making it 44 years old in 2025.
What condition is Extension of SR 20 over Upright Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Extension of SR 20 over Upright Channel carry?
About 1,349 vehicles per day (2010 count), of which roughly 1% are trucks.
How long is Extension of SR 20 over Upright Channel?
The structure is 105 ft (32 m) long with a longest span of 80 ft (24.4 m) and a deck 24 ft wide.
Who owns Extension of SR 20 over Upright Channel?
It is owned by the State Highway Agency.