Mid Salmon/Boulder over N. Fk Boulder CR
FairOkanogan County, Washington · No Data Entered · Structure no. 060805000001026
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 41 ft
- 1 main span
- Daily traffic
- 35
- 1992 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Mid Salmon/Boulder over N. Fk Boulder CR is a wood or timber stringer/multi-beam or girder carrying Mid Salmon/Boulder over N. Fk Boulder CR in Okanogan County, Washington. It was built in 1960, so it is 65 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 35 vehicles a day, projected to reach 52 by 2045. The structure is 41 ft (12.5 m) long and 18 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mid Salmon/Boulder over N. Fk Boulder CR built?
It was built in 1960, making it 65 years old in 2025.
What condition is Mid Salmon/Boulder over N. Fk Boulder CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Mid Salmon/Boulder over N. Fk Boulder CR carry?
About 35 vehicles per day (1992 count).
How long is Mid Salmon/Boulder over N. Fk Boulder CR?
The structure is 41 ft (12.5 m) long with a longest span of 39 ft (11.9 m) and a deck 18 ft wide.
Who owns Mid Salmon/Boulder over N. Fk Boulder CR?
It is owned by the U.S. Forest Service.