Salmon/Boulder RD over North Fork Boulder Creek
FairOkanogan County, Washington · No Data Entered · Structure no. 060805000001021
- Built
- 1949
- 76 years old
- Condition
- Fair
- inspected July 2023
- Type
- Frame
- Concrete Continuous
- Length
- 100 ft
- 3 main spans
- Daily traffic
- 158
- 1992 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Salmon/Boulder RD over North Fork Boulder Creek is a concrete continuous frame carrying Salmon/Boulder RD over North Fork Boulder Creek in Okanogan County, Washington. It was built in 1949, so it is 76 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 158 vehicles a day, roughly 10% of them trucks, projected to reach 237 by 2045. The structure is 100 ft (30.5 m) long and 17 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Salmon/Boulder RD over North Fork Boulder Creek built?
It was built in 1949, making it 76 years old in 2025.
What condition is Salmon/Boulder RD over North Fork Boulder Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Salmon/Boulder RD over North Fork Boulder Creek carry?
About 158 vehicles per day (1992 count), of which roughly 10% are trucks.
How long is Salmon/Boulder RD over North Fork Boulder Creek?
The structure is 100 ft (30.5 m) long with a longest span of 60 ft (18.3 m) and a deck 17 ft wide.
Who owns Salmon/Boulder RD over North Fork Boulder Creek?
It is owned by the U.S. Forest Service.