Badger Pocket Road over Johnson Drainage
GoodKittitas County, Washington · 0.15 N Sorenson RD · Structure no. 088278000000000
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected November 2024
- Type
- Slab
- Concrete
- Length
- 24 ft
- 1 main span
- Daily traffic
- 168
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Badger Pocket Road over Johnson Drainage is a concrete slab carrying Badger Pocket Road over Johnson Drainage in Kittitas County, Washington. It was built in 2011, so it is 14 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 168 vehicles a day, roughly 44% of them trucks, projected to reach 445 by 2043. The structure is 24 ft (7.3 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Badger Pocket Road over Johnson Drainage built?
It was built in 2011, making it 14 years old in 2025.
What condition is Badger Pocket Road over Johnson Drainage in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Badger Pocket Road over Johnson Drainage carry?
About 168 vehicles per day (2023 count), of which roughly 44% are trucks.
How long is Badger Pocket Road over Johnson Drainage?
The structure is 24 ft (7.3 m) long with a longest span of 23 ft (7 m) and a deck 24 ft wide.
Who owns Badger Pocket Road over Johnson Drainage?
It is owned by the County Highway Agency.