Fairview Ave N over Union Bay
GoodKing County, Washington · 1241 Fairview Ave N · Structure no. 089209000000000
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 405 ft
- 4 main spans
- Daily traffic
- 3,600
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Fairview Ave N over Union Bay is a concrete continuous stringer/multi-beam or girder carrying Fairview Ave N over Union Bay in King County, Washington. It was built in 2021, so it is 4 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,600 vehicles a day, roughly 5% of them trucks, projected to reach 4,000 by 2041. The structure is 405 ft (123.4 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fairview Ave N over Union Bay built?
It was built in 2021, making it 4 years old in 2025.
What condition is Fairview Ave N over Union Bay in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Fairview Ave N over Union Bay carry?
About 3,600 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Fairview Ave N over Union Bay?
The structure is 405 ft (123.4 m) long with a longest span of 135 ft (41.1 m) and a deck 67 ft wide.
Who owns Fairview Ave N over Union Bay?
It is owned by the City or Municipal Highway Agency.