US Bridges

72nd Avenue South over Mill Creek

Good

King County, Washington · 0.25 MI E of SR-181 · Structure no. 088997000000000

Built
2017
8 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
106 ft
1 main span
Daily traffic
5,000
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

72nd Avenue South over Mill Creek is a prestressed concrete box beam or girders - multiple carrying 72nd Avenue South over Mill Creek in King County, Washington. It was built in 2017, so it is 8 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 20% of them trucks, projected to reach 7,500 by 2042. The structure is 106 ft (32.3 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries72nd Avenue South
CrossesMill Creek
Location0.25 MI E of SR-181
RouteCity Street 615
Coordinates47.42481, -122.24453
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating101.4 US tons
Inventory rating53.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length106 ft (32.3 m)
Longest span100 ft (30.5 m)
Deck width48 ft (14.5 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2018)
Projected traffic7,500 by 2042
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$1.7 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 72nd Avenue South over Mill Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is 72nd Avenue South over Mill Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does 72nd Avenue South over Mill Creek carry?

About 5,000 vehicles per day (2018 count), of which roughly 20% are trucks.

How long is 72nd Avenue South over Mill Creek?

The structure is 106 ft (32.3 m) long with a longest span of 100 ft (30.5 m) and a deck 48 ft wide.

Who owns 72nd Avenue South over Mill Creek?

It is owned by the City or Municipal Highway Agency.