196 - 200 Street over Green River
FairKing County, Washington · 0.8 MI W of SR-18 · Structure no. 087121000000000
- Built
- 1998
- 27 years old
- Condition
- Fair
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 325 ft
- 2 main spans
- Daily traffic
- 17,406
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
196 - 200 Street over Green River is a prestressed concrete continuous box beam or girders - multiple carrying 196 - 200 Street over Green River in King County, Washington. It was built in 1998, so it is 27 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,406 vehicles a day, roughly 9% of them trucks, projected to reach 21,500 by 2039. The structure is 325 ft (99.1 m) long and 73 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 196 - 200 Street over Green River built?
It was built in 1998, making it 27 years old in 2025.
What condition is 196 - 200 Street over Green River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does 196 - 200 Street over Green River carry?
About 17,406 vehicles per day (2019 count), of which roughly 9% are trucks.
How long is 196 - 200 Street over Green River?
The structure is 325 ft (99.1 m) long with a longest span of 170 ft (51.8 m) and a deck 73 ft wide.
Who owns 196 - 200 Street over Green River?
It is owned by the City or Municipal Highway Agency and maintained by the County Highway Agency.