US Bridges

Totem Lake Blvd over Trib to Juanita CR

Good

King County, Washington · 6.0 N JCT SR 520 · Structure no. 0019573C0000000

Built
2023
2 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
23 ft
1 main span
Daily traffic
24,107
2023 count
Owner
State
State Highway Agency

About this bridge

Totem Lake Blvd over Trib to Juanita CR is a concrete culvert carrying Totem Lake Blvd over Trib to Juanita CR in King County, Washington. It was built in 2023, so it is 2 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,107 vehicles a day, projected to reach 37,253 by 2043. The structure is 23 ft (6.9 m) long and 75 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTotem Lake Blvd
CrossesTrib to Juanita CR
Location6.0 N JCT SR 520
RouteCity Street 0
Coordinates47.71753, -122.18629
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.8 US tons
Inventory rating66.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length23 ft (6.9 m)
Longest span23 ft (6.9 m)
Deck width75 ft (23 m)
Roadway width75 ft (23 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,107 (2023)
Projected traffic37,253 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$826,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Totem Lake Blvd over Trib to Juanita CR built?

It was built in 2023, making it 2 years old in 2025.

What condition is Totem Lake Blvd over Trib to Juanita CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Totem Lake Blvd over Trib to Juanita CR carry?

About 24,107 vehicles per day (2023 count).

How long is Totem Lake Blvd over Trib to Juanita CR?

The structure is 23 ft (6.9 m) long with a longest span of 23 ft (6.9 m) and a deck 75 ft wide.

Who owns Totem Lake Blvd over Trib to Juanita CR?

It is owned by the State Highway Agency.