US Bridges

NE 128th ST over SB I-405

Good

King County, Washington · 5.7 N JCT SR 520 · Structure no. 0016932A0000000

Built
2006
19 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
124 ft
1 main span
Daily traffic
1,200
2003 count
Owner
State
State Highway Agency

About this bridge

NE 128th ST over SB I-405 is a steel stringer/multi-beam or girder carrying NE 128th ST over SB I-405 in King County, Washington. It was built in 2006, so it is 19 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,200 vehicles a day, roughly 5% of them trucks. The structure is 124 ft (37.8 m) long and 112 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNE 128th ST
CrossesSB I-405
Location5.7 N JCT SR 520
RouteCity Street 0
Coordinates47.71483, -122.18592
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.9 US tons
Inventory rating46 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length124 ft (37.8 m)
Longest span124 ft (37.8 m)
Deck width112 ft (34.1 m)
Roadway width81 ft (24.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2003)
Projected traffic—
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$4.9 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was NE 128th ST over SB I-405 built?

It was built in 2006, making it 19 years old in 2025.

What condition is NE 128th ST over SB I-405 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does NE 128th ST over SB I-405 carry?

About 1,200 vehicles per day (2003 count), of which roughly 5% are trucks.

How long is NE 128th ST over SB I-405?

The structure is 124 ft (37.8 m) long with a longest span of 124 ft (37.8 m) and a deck 112 ft wide.

Who owns NE 128th ST over SB I-405?

It is owned by the State Highway Agency.