US Bridges

S-W & S-E Ramps over 115th Ave NE & Trail

Good

King County, Washington · 0.2 N JCT SR 520 · Structure no. 0007839A0000000

Built
1966
59 years old, rebuilt 1994
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
232 ft
3 main spans
Daily traffic
9,907
2023 count
Owner
State
State Highway Agency

About this bridge

S-W & S-E Ramps over 115th Ave NE & Trail is a prestressed concrete continuous stringer/multi-beam or girder carrying S-W & S-E Ramps over 115th Ave NE & Trail in King County, Washington. It was built in 1966 and reconstructed in 1994, so it is 59 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,907 vehicles a day, roughly 5% of them trucks, projected to reach 15,568 by 2039. The structure is 232 ft (70.7 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS-W & S-E Ramps
Crosses115th Ave NE & Trail
Location0.2 N JCT SR 520
RouteInterstate 405
Coordinates47.63558, -122.1873
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating16.1 US tons
Inventory rating12.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length232 ft (70.7 m)
Longest span84 ft (25.6 m)
Deck width44 ft (13.4 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,907 (2023)
Projected traffic15,568 by 2039
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$4.7 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was S-W & S-E Ramps over 115th Ave NE & Trail built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1994.

What condition is S-W & S-E Ramps over 115th Ave NE & Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does S-W & S-E Ramps over 115th Ave NE & Trail carry?

About 9,907 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is S-W & S-E Ramps over 115th Ave NE & Trail?

The structure is 232 ft (70.7 m) long with a longest span of 84 ft (25.6 m) and a deck 44 ft wide.

Who owns S-W & S-E Ramps over 115th Ave NE & Trail?

It is owned by the State Highway Agency.