US Bridges

SR 520 E-N Ramp over 115th Ave NE & Trail

Fair

King County, Washington · JCT I-405 · Structure no. 0014039E0000000

Built
1993
32 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
320 ft
4 main spans
Daily traffic
12,471
2023 count
Owner
State
State Highway Agency

About this bridge

SR 520 E-N Ramp over 115th Ave NE & Trail is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 520 E-N Ramp over 115th Ave NE & Trail in King County, Washington. It was built in 1993, so it is 32 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,471 vehicles a day, roughly 5% of them trucks, projected to reach 19,598 by 2039. The structure is 320 ft (97.5 m) long and 50 ft wide.

CarriesSR 520 E-N Ramp
Crosses115th Ave NE & Trail
LocationJCT I-405
RouteInterstate 520
Coordinates47.63406, -122.18664
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating33 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length320 ft (97.5 m)
Longest span92 ft (28 m)
Deck width50 ft (15.3 m)
Roadway width47 ft (14.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,471 (2023)
Projected traffic19,598 by 2039
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$8.2 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 520 E-N Ramp over 115th Ave NE & Trail built?

It was built in 1993, making it 32 years old in 2025.

What condition is SR 520 E-N Ramp over 115th Ave NE & Trail in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does SR 520 E-N Ramp over 115th Ave NE & Trail carry?

About 12,471 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SR 520 E-N Ramp over 115th Ave NE & Trail?

The structure is 320 ft (97.5 m) long with a longest span of 92 ft (28 m) and a deck 50 ft wide.

Who owns SR 520 E-N Ramp over 115th Ave NE & Trail?

It is owned by the State Highway Agency.