GoodGrays Harbor County, Washington · 0.35 W Pt Brown Ave · Structure no. 089014000000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 121 ft
- 1 main span
- Daily traffic
- 525
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Razor Clam DR SW over Lake Minard Canal is a prestressed concrete stringer/multi-beam or girder carrying S Razor Clam DR SW over Lake Minard Canal in Grays Harbor County, Washington. It was built in 2018, so it is 7 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 525 vehicles a day, roughly 10% of them trucks, projected to reach 550 by 2042. The structure is 121 ft (36.9 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Razor Clam DR SW over Lake Minard Canal built?
It was built in 2018, making it 7 years old in 2025.
What condition is S Razor Clam DR SW over Lake Minard Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does S Razor Clam DR SW over Lake Minard Canal carry?
About 525 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is S Razor Clam DR SW over Lake Minard Canal?
The structure is 121 ft (36.9 m) long with a longest span of 116 ft (35.4 m) and a deck 39 ft wide.
Who owns S Razor Clam DR SW over Lake Minard Canal?
It is owned by the City or Municipal Highway Agency.