IRR BIA RTE 2 over Trib Railroad Creek
FairGrays Harbor County, Washington · 11KM NE of Mo Clips · Structure no. 0000P06117B0206
- Built
- 2018
- 7 years old
- Condition
- Fair
- inspected August 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 60 ft
- 1 main span
- Daily traffic
- 100
- 2021 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 2 over Trib Railroad Creek is a steel girder and floorbeam system carrying IRR BIA RTE 2 over Trib Railroad Creek in Grays Harbor County, Washington. It was built in 2018, so it is 7 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 20% of them trucks, projected to reach 100 by 2040. The structure is 60 ft (18.3 m) long and 12 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 2 over Trib Railroad Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is IRR BIA RTE 2 over Trib Railroad Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does IRR BIA RTE 2 over Trib Railroad Creek carry?
About 100 vehicles per day (2021 count), of which roughly 20% are trucks.
How long is IRR BIA RTE 2 over Trib Railroad Creek?
The structure is 60 ft (18.3 m) long with a longest span of 51 ft (15.6 m) and a deck 12 ft wide.
Who owns IRR BIA RTE 2 over Trib Railroad Creek?
It is owned by the Bureau of Indian Affairs.