IRR BIA RTE 26 over North Fork Moclips River
GoodGrays Harbor County, Washington · 3.2 KM N.E. of Moclips · Structure no. 00000000000P001
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 200 ft
- 2 main spans
- Daily traffic
- 375
- 2021 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 26 over North Fork Moclips River is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE 26 over North Fork Moclips River in Grays Harbor County, Washington. It was built in 1976, so it is 49 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 375 vehicles a day, roughly 15% of them trucks, projected to reach 409 by 2040. The structure is 200 ft (61 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 26 over North Fork Moclips River built?
It was built in 1976, making it 49 years old in 2025.
What condition is IRR BIA RTE 26 over North Fork Moclips River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does IRR BIA RTE 26 over North Fork Moclips River carry?
About 375 vehicles per day (2021 count), of which roughly 15% are trucks.
How long is IRR BIA RTE 26 over North Fork Moclips River?
The structure is 200 ft (61 m) long with a longest span of 97 ft (29.7 m) and a deck 35 ft wide.
Who owns IRR BIA RTE 26 over North Fork Moclips River?
It is owned by the Bureau of Indian Affairs.