Malaga-Alcoa HWY over Stemilt Cr.
FairPosted for loadChelan County, Washington · 2.7 from S. Wenatchee Av · Structure no. 082544000000000
- Built
- 1951
- 74 years old
- Condition
- Fair
- inspected September 2023
- Type
- Slab
- Concrete Continuous
- Length
- 44 ft
- 3 main spans
- Daily traffic
- 5,578
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Malaga-Alcoa HWY over Stemilt Cr. is a concrete continuous slab carrying Malaga-Alcoa HWY over Stemilt Cr. in Chelan County, Washington. It was built in 1951, so it is 74 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 5,578 vehicles a day, roughly 7% of them trucks, projected to reach 6,930 by 2043. The structure is 44 ft (13.4 m) long and 30 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Malaga-Alcoa HWY over Stemilt Cr. built?
It was built in 1951, making it 74 years old in 2025.
What condition is Malaga-Alcoa HWY over Stemilt Cr. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Malaga-Alcoa HWY over Stemilt Cr. carry?
About 5,578 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is Malaga-Alcoa HWY over Stemilt Cr.?
The structure is 44 ft (13.4 m) long with a longest span of 30 ft (9.1 m) and a deck 30 ft wide.
Who owns Malaga-Alcoa HWY over Stemilt Cr.?
It is owned by the County Highway Agency.