US Bridges

Second Street over Highline Canal

Good

Chelan County, Washington · W of Canal Blvd S of 5th · Structure no. 089260000000000

Built
2020
5 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
26 ft
1 main span
Daily traffic
800
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Second Street over Highline Canal is a prestressed concrete stringer/multi-beam or girder carrying Second Street over Highline Canal in Chelan County, Washington. It was built in 2020, so it is 5 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 800 vehicles a day, roughly 3% of them trucks, projected to reach 1,000 by 2041. The structure is 26 ft (7.9 m) long and 42 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesSecond Street
CrossesHighline Canal
LocationW of Canal Blvd S of 5th
RouteCity Street 1910
Coordinates47.42736, -120.35003
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length26 ft (7.9 m)
Longest span24 ft (7.3 m)
Deck width42 ft (12.7 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2021)
Projected traffic1,000 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$395,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Second Street over Highline Canal built?

It was built in 2020, making it 5 years old in 2025.

What condition is Second Street over Highline Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Second Street over Highline Canal carry?

About 800 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Second Street over Highline Canal?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 42 ft wide.

Who owns Second Street over Highline Canal?

It is owned by the City or Municipal Highway Agency.