US Bridges

Deal RD over Dry Wash

Good

Adams County, Washington · 1.53 N. Lind-Warden · Structure no. 087186000000000

Built
2004
21 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
55 ft
1 main span
Daily traffic
81
2018 count
Owner
County
County Highway Agency

About this bridge

Deal RD over Dry Wash is a concrete continuous stringer/multi-beam or girder carrying Deal RD over Dry Wash in Adams County, Washington. It was built in 2004, so it is 21 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 81 vehicles a day, roughly 53% of them trucks, projected to reach 66 by 2039. The structure is 55 ft (16.8 m) long and 32 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesDeal RD
CrossesDry Wash
Location1.53 N. Lind-Warden
RouteCounty Highway 63364
Coordinates46.98039, -118.87591
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.4 US tons
Inventory rating39.2 US tons

Structure

MaterialConcrete Continuous
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length55 ft (16.8 m)
Longest span53 ft (16.1 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic81 (2018)
Projected traffic66 by 2039
Trucks53%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.4 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Deal RD over Dry Wash built?

It was built in 2004, making it 21 years old in 2025.

What condition is Deal RD over Dry Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Deal RD over Dry Wash carry?

About 81 vehicles per day (2018 count), of which roughly 53% are trucks.

How long is Deal RD over Dry Wash?

The structure is 55 ft (16.8 m) long with a longest span of 53 ft (16.1 m) and a deck 32 ft wide.

Who owns Deal RD over Dry Wash?

It is owned by the County Highway Agency.