Providence RD over Dry Relief
FairAdams County, Washington · 00.59 MI E Johnson · Structure no. 079936000000000
- Built
- 1900
- 125 years old, rebuilt 1976
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 23 ft
- 1 main span
- Daily traffic
- 10
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Providence RD over Dry Relief is a steel stringer/multi-beam or girder carrying Providence RD over Dry Relief in Adams County, Washington. It was built in 1900 and reconstructed in 1976, so it is 125 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, roughly 4% of them trucks, projected to reach 13 by 2039. The structure is 23 ft (7 m) long and 24 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Providence RD over Dry Relief built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1976.
What condition is Providence RD over Dry Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Providence RD over Dry Relief carry?
About 10 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is Providence RD over Dry Relief?
The structure is 23 ft (7 m) long with a longest span of 21 ft (6.5 m) and a deck 24 ft wide.
Who owns Providence RD over Dry Relief?
It is owned by the County Highway Agency.