US Bridges

C3021 over Twenty Mile Stream

Good

Windsor County, Vermont · 0.25 MI to JCT W CL2 TH3 · Structure no. 101406003714061

Built
2015
10 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
46 ft
1 main span
Daily traffic
50
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3021 over Twenty Mile Stream is a steel stringer/multi-beam or girder carrying C3021 over Twenty Mile Stream in Windsor County, Vermont. It was built in 2015, so it is 10 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 2% of them trucks, projected to reach 53 by 2029. The structure is 46 ft (14 m) long and 18 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesC3021
CrossesTwenty Mile Stream
Location0.25 MI to JCT W CL2 TH3
StateVermont
Coordinates43.40312, -72.63449
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating99 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length46 ft (14 m)
Longest span42 ft (12.8 m)
Deck width18 ft (5.5 m)
Roadway width17 ft (5.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2019)
Projected traffic53 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C3021 over Twenty Mile Stream built?

It was built in 2015, making it 10 years old in 2025.

What condition is C3021 over Twenty Mile Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does C3021 over Twenty Mile Stream carry?

About 50 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3021 over Twenty Mile Stream?

The structure is 46 ft (14 m) long with a longest span of 42 ft (12.8 m) and a deck 18 ft wide.

Who owns C3021 over Twenty Mile Stream?

It is owned by the Town or Township Highway Agency.