US Bridges

C3019 over Gilead Brook

Good

Windsor County, Vermont · 0.1 MI JCT TH 19 + TH 7 · Structure no. 101404003514041

Built
2014
11 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
34 ft
1 main span
Daily traffic
40
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3019 over Gilead Brook is a concrete culvert carrying C3019 over Gilead Brook in Windsor County, Vermont. It was built in 2014, so it is 11 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, roughly 2% of them trucks, projected to reach 42 by 2029. The structure is 34 ft (10.4 m) long and 18 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesC3019
CrossesGilead Brook
Location0.1 MI JCT TH 19 + TH 7
StateVermont
Coordinates43.88362, -72.71274
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67 US tons
Inventory rating52 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width18 ft (5.5 m)
Roadway width17 ft (5.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2019)
Projected traffic42 by 2029
Trucks2%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C3019 over Gilead Brook built?

It was built in 2014, making it 11 years old in 2025.

What condition is C3019 over Gilead Brook in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does C3019 over Gilead Brook carry?

About 40 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3019 over Gilead Brook?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 18 ft wide.

Who owns C3019 over Gilead Brook?

It is owned by the Town or Township Highway Agency.