C3024 over Green River

Good

Windham County, Vermont · @ JCT W CL2 TH1 · Structure no. 101308003413081

Built
2013
12 years old
Condition
Good
inspected July 2024
Type
Slab
Prestressed Concrete
Length
56 ft
1 main span
Daily traffic
100
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3024 over Green River is a prestressed concrete slab carrying C3024 over Green River in Windham County, Vermont. It was built in 2013, so it is 12 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 105 by 2029. The structure is 56 ft (17.1 m) long and 20 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesC3024
CrossesGreen River
Location@ JCT W CL2 TH1
StateVermont
Coordinates42.79801, -72.68346
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length56 ft (17.1 m)
Longest span54 ft (16.5 m)
Deck width20 ft (6.1 m)
Roadway width19 ft (5.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2019)
Projected traffic105 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C3024 over Green River built?

It was built in 2013, making it 12 years old in 2025.

What condition is C3024 over Green River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does C3024 over Green River carry?

About 100 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3024 over Green River?

The structure is 56 ft (17.1 m) long with a longest span of 54 ft (16.5 m) and a deck 20 ft wide.

Who owns C3024 over Green River?

It is owned by the Town or Township Highway Agency.