US Bridges

C2003 over Lake St. Catherine

Good

Rutland County, Vermont · 0.05 MI to JCT Vt 30 · Structure no. 101126000911261

Built
1996
29 years old
Condition
Good
inspected October 2024
Type
Slab
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
1,120
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C2003 over Lake St. Catherine is a prestressed concrete slab carrying C2003 over Lake St. Catherine in Rutland County, Vermont. It was built in 1996, so it is 29 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,120 vehicles a day, roughly 2% of them trucks, projected to reach 1,176 by 2029. The structure is 50 ft (15.2 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesC2003
CrossesLake St. Catherine
Location0.05 MI to JCT Vt 30
StateVermont
Coordinates43.44524, -73.20341
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating78 US tons
Inventory rating72 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length50 ft (15.2 m)
Longest span48 ft (14.6 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,120 (2019)
Projected traffic1,176 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C2003 over Lake St. Catherine built?

It was built in 1996, making it 29 years old in 2025.

What condition is C2003 over Lake St. Catherine in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does C2003 over Lake St. Catherine carry?

About 1,120 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C2003 over Lake St. Catherine?

The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 28 ft wide.

Who owns C2003 over Lake St. Catherine?

It is owned by the Town or Township Highway Agency.