US Bridges

C3010 over Clarendon River

Good

Rutland County, Vermont · 0.15 MI to JCT W CL2 TH3 · Structure no. 101105002511051

Built
2001
24 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
34 ft
1 main span
Daily traffic
460
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3010 over Clarendon River is a concrete culvert carrying C3010 over Clarendon River in Rutland County, Vermont. It was built in 2001, so it is 24 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 460 vehicles a day, roughly 1% of them trucks, projected to reach 483 by 2029. The structure is 34 ft (10.4 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesC3010
CrossesClarendon River
Location0.15 MI to JCT W CL2 TH3
StateVermont
Coordinates43.52081, -73.01202
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width31 ft (9.4 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic460 (2019)
Projected traffic483 by 2029
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C3010 over Clarendon River built?

It was built in 2001, making it 24 years old in 2025.

What condition is C3010 over Clarendon River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does C3010 over Clarendon River carry?

About 460 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is C3010 over Clarendon River?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 31 ft wide.

Who owns C3010 over Clarendon River?

It is owned by the Town or Township Highway Agency.