US Bridges

C3023 over Wildcat Brook

Good

Rutland County, Vermont · 2.5 MI to JCT W CL2 TH1 · Structure no. 101104001911041

Built
2010
15 years old
Condition
Good
inspected October 2023
Type
Slab
Concrete
Length
36 ft
1 main span
Daily traffic
10
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3023 over Wildcat Brook is a concrete slab carrying C3023 over Wildcat Brook in Rutland County, Vermont. It was built in 2010, so it is 15 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 2% of them trucks, projected to reach 11 by 2029. The structure is 36 ft (11 m) long and 21 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesC3023
CrossesWildcat Brook
Location2.5 MI to JCT W CL2 TH1
StateVermont
Coordinates43.69949, -72.88332
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78 US tons
Inventory rating47 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length36 ft (11 m)
Longest span33 ft (10.1 m)
Deck width21 ft (6.4 m)
Roadway width20 ft (6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2019)
Projected traffic11 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C3023 over Wildcat Brook built?

It was built in 2010, making it 15 years old in 2025.

What condition is C3023 over Wildcat Brook in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does C3023 over Wildcat Brook carry?

About 10 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3023 over Wildcat Brook?

The structure is 36 ft (11 m) long with a longest span of 33 ft (10.1 m) and a deck 21 ft wide.

Who owns C3023 over Wildcat Brook?

It is owned by the Town or Township Highway Agency.