C30VE over S. Bay Lake Memgog
GoodOrleans County, Vermont · 0.04 MI to East Main St. · Structure no. 101015000910151
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 299 ft
- 3 main spans
- Daily traffic
- 5,900
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
C30VE over S. Bay Lake Memgog is a steel continuous stringer/multi-beam or girder carrying C30VE over S. Bay Lake Memgog in Orleans County, Vermont. It was built in 2013, so it is 12 years old, younger than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,900 vehicles a day, roughly 3% of them trucks, projected to reach 6,195 by 2029. The structure is 299 ft (91.1 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C30VE over S. Bay Lake Memgog built?
It was built in 2013, making it 12 years old in 2025.
What condition is C30VE over S. Bay Lake Memgog in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does C30VE over S. Bay Lake Memgog carry?
About 5,900 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is C30VE over S. Bay Lake Memgog?
The structure is 299 ft (91.1 m) long with a longest span of 120 ft (36.6 m) and a deck 36 ft wide.
Who owns C30VE over S. Bay Lake Memgog?
It is owned by the Town or Township Highway Agency.