US Bridges

C2002 over Brook

Good

Orange County, Vermont · 0.65 MI to JCT W CL3 TH7 · Structure no. 100910002309101

Built
2023
2 years old
Condition
Good
inspected October 2024
Type
Frame
Concrete
Length
26 ft
1 main span
Daily traffic
560
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C2002 over Brook is a concrete frame carrying C2002 over Brook in Orange County, Vermont. It was built in 2023, so it is 2 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 560 vehicles a day, roughly 4% of them trucks, projected to reach 588 by 2029. The structure is 26 ft (7.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesC2002
CrossesBrook
Location0.65 MI to JCT W CL3 TH7
StateVermont
Coordinates43.89372, -72.39975
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating44 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length26 ft (7.9 m)
Longest span24 ft (7.3 m)
Deck width28 ft (8.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic560 (2019)
Projected traffic588 by 2029
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C2002 over Brook built?

It was built in 2023, making it 2 years old in 2025.

What condition is C2002 over Brook in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does C2002 over Brook carry?

About 560 vehicles per day (2019 count), of which roughly 4% are trucks.

How long is C2002 over Brook?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 28 ft wide.

Who owns C2002 over Brook?

It is owned by the Town or Township Highway Agency.