US Bridges

C30LE over Stevens Brook

Good

Franklin County, Vermont · 0.2 MI to JCT TH154/NASON · Structure no. 100612001006121

Built
1985
40 years old
Condition
Good
inspected September 2023
Type
Tee Beam
Concrete
Length
24 ft
1 main span
Daily traffic
100
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

C30LE over Stevens Brook is a concrete tee beam carrying C30LE over Stevens Brook in Franklin County, Vermont. It was built in 1985, so it is 40 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 105 by 2029. The structure is 24 ft (7.3 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesC30LE
CrossesStevens Brook
Location0.2 MI to JCT TH154/NASON
RouteCity Street C30LE
StateVermont
Coordinates44.80558, -73.08932
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length24 ft (7.3 m)
Longest span22 ft (6.7 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2019)
Projected traffic105 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C30LE over Stevens Brook built?

It was built in 1985, making it 40 years old in 2025.

What condition is C30LE over Stevens Brook in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does C30LE over Stevens Brook carry?

About 100 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C30LE over Stevens Brook?

The structure is 24 ft (7.3 m) long with a longest span of 22 ft (6.7 m) and a deck 24 ft wide.

Who owns C30LE over Stevens Brook?

It is owned by the City or Municipal Highway Agency.