US Bridges

C3008 over Pike River

Good

Franklin County, Vermont · 02 MI N JCT TH15 · Structure no. 100602002606021

Built
2007
18 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
61 ft
1 main span
Daily traffic
30
30 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3008 over Pike River is a prestressed concrete box beam or girders - multiple carrying C3008 over Pike River in Franklin County, Vermont. It was built in 2007, so it is 18 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, projected to reach 40 by 2033. The structure is 61 ft (18.6 m) long and 21 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesC3008
CrossesPike River
Location02 MI N JCT TH15
StateVermont
Coordinates45.00881, -72.7747
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length61 ft (18.6 m)
Longest span58 ft (17.7 m)
Deck width21 ft (6.4 m)
Roadway width20 ft (6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (30)
Projected traffic40 by 2033
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was C3008 over Pike River built?

It was built in 2007, making it 18 years old in 2025.

What condition is C3008 over Pike River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does C3008 over Pike River carry?

About 30 vehicles per day (30 count).

How long is C3008 over Pike River?

The structure is 61 ft (18.6 m) long with a longest span of 58 ft (17.7 m) and a deck 21 ft wide.

Who owns C3008 over Pike River?

It is owned by the Town or Township Highway Agency.