US Bridges

TR 02 FAS 105 over W. Br. Deerfield River

Good

Bennington County, Vermont · 0.2 MI S Jct. VT.100 · Structure no. 200105003202092

Built
2013
12 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
109 ft
1 main span
Daily traffic
610
2017 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 02 FAS 105 over W. Br. Deerfield River is a steel stringer/multi-beam or girder carrying TR 02 FAS 105 over W. Br. Deerfield River in Bennington County, Vermont. It was built in 2013, so it is 12 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 610 vehicles a day, roughly 8% of them trucks, projected to reach 641 by 2027. The structure is 109 ft (33.2 m) long and 37 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesTR 02 FAS 105
CrossesW. Br. Deerfield River
Location0.2 MI S Jct. VT.100
RouteCounty Highway 2
StateVermont
Coordinates42.77036, -72.94788
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating46 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length109 ft (33.2 m)
Longest span105 ft (32 m)
Deck width37 ft (11.4 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic610 (2017)
Projected traffic641 by 2027
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 02 FAS 105 over W. Br. Deerfield River built?

It was built in 2013, making it 12 years old in 2025.

What condition is TR 02 FAS 105 over W. Br. Deerfield River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does TR 02 FAS 105 over W. Br. Deerfield River carry?

About 610 vehicles per day (2017 count), of which roughly 8% are trucks.

How long is TR 02 FAS 105 over W. Br. Deerfield River?

The structure is 109 ft (33.2 m) long with a longest span of 105 ft (32 m) and a deck 37 ft wide.

Who owns TR 02 FAS 105 over W. Br. Deerfield River?

It is owned by the Town or Township Highway Agency.