US Bridges

C2005 over New Haven River

Good

Addison County, Vermont · 0.01 MI to JCT W C3 TH22 · Structure no. 100103001101031

Built
1973
52 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
107 ft
1 main span
Daily traffic
750
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C2005 over New Haven River is a steel stringer/multi-beam or girder carrying C2005 over New Haven River in Addison County, Vermont. It was built in 1973, so it is 52 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 750 vehicles a day, roughly 2% of them trucks, projected to reach 788 by 2029. The structure is 107 ft (32.6 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesC2005
CrossesNew Haven River
Location0.01 MI to JCT W C3 TH22
StateVermont
Coordinates44.12901, -73.08328
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating99 US tons
Inventory rating67 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length107 ft (32.6 m)
Longest span105 ft (32 m)
Deck width33 ft (10 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic750 (2019)
Projected traffic788 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C2005 over New Haven River built?

It was built in 1973, making it 52 years old in 2025.

What condition is C2005 over New Haven River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does C2005 over New Haven River carry?

About 750 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C2005 over New Haven River?

The structure is 107 ft (32.6 m) long with a longest span of 105 ft (32 m) and a deck 33 ft wide.

Who owns C2005 over New Haven River?

It is owned by the Town or Township Highway Agency.