Chippenham Parkway over James Rv;cherke RD & CSX
FairRichmond city, Virginia · 0.0 Wcl Rich & 0.0 Henric · Structure no. 000000000009859
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 4,227 ft
- 28 main spans
- Daily traffic
- 19,419
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Chippenham Parkway over James Rv;cherke RD & CSX is a steel continuous stringer/multi-beam or girder carrying Chippenham Parkway over James Rv;cherke RD & CSX in Richmond city, Virginia. It was built in 1990, so it is 35 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,419 vehicles a day, projected to reach 28,353 by 2045. The structure is 4,227 ft (1,288.5 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chippenham Parkway over James Rv;cherke RD & CSX built?
It was built in 1990, making it 35 years old in 2025.
What condition is Chippenham Parkway over James Rv;cherke RD & CSX in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Chippenham Parkway over James Rv;cherke RD & CSX carry?
About 19,419 vehicles per day (2022 count).
How long is Chippenham Parkway over James Rv;cherke RD & CSX?
The structure is 4,227 ft (1,288.5 m) long with a longest span of 215 ft (65.5 m) and a deck 42 ft wide.
Who owns Chippenham Parkway over James Rv;cherke RD & CSX?
It is owned by the State Highway Agency.