US Bridges

Ramp to Is 264 Ebl over Curlew Light RR 264 Cd

Good

Norfolk city, Virginia · 2.31 Miles from Route 407 · Structure no. 000000000028988

Built
2019
6 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
2,393 ft
17 main spans
Daily traffic
27,000
2018 count
Owner
State
State Highway Agency

About this bridge

Ramp to Is 264 Ebl over Curlew Light RR 264 Cd is a steel continuous stringer/multi-beam or girder carrying Ramp to Is 264 Ebl over Curlew Light RR 264 Cd in Norfolk city, Virginia. It was built in 2019, so it is 6 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 27,000 vehicles a day, projected to reach 40,000 by 2042. The structure is 2,393 ft (729.5 m) long and 45 ft wide.

CarriesRamp to Is 264 Ebl
CrossesCurlew Light RR 264 Cd
Location2.31 Miles from Route 407
RouteInterstate 64
Coordinates36.84244, -76.19558
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.3 US tons
Inventory rating37.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans17 (+4 approach)
Design loadHL 93
Structure length2,393 ft (729.5 m)
Longest span182 ft (55.5 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,000 (2018)
Projected traffic40,000 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp to Is 264 Ebl over Curlew Light RR 264 Cd built?

It was built in 2019, making it 6 years old in 2025.

What condition is Ramp to Is 264 Ebl over Curlew Light RR 264 Cd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Ramp to Is 264 Ebl over Curlew Light RR 264 Cd carry?

About 27,000 vehicles per day (2018 count).

How long is Ramp to Is 264 Ebl over Curlew Light RR 264 Cd?

The structure is 2,393 ft (729.5 m) long with a longest span of 182 ft (55.5 m) and a deck 45 ft wide.

Who owns Ramp to Is 264 Ebl over Curlew Light RR 264 Cd?

It is owned by the State Highway Agency.