Is 264 Wbl over Hrt Light Rail
FairNorfolk city, Virginia · 1.17 FR 460/2.11 to 13 · Structure no. 000000000021009
- Built
- 1968
- 57 years old, rebuilt 1998
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 281 ft
- 3 main spans
- Daily traffic
- 57,447
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Is 264 Wbl over Hrt Light Rail is a steel stringer/multi-beam or girder carrying Is 264 Wbl over Hrt Light Rail in Norfolk city, Virginia. It was built in 1968 and reconstructed in 1998, so it is 57 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 57,447 vehicles a day, projected to reach 61,078 by 2045. The structure is 281 ft (85.6 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Is 264 Wbl over Hrt Light Rail built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1998.
What condition is Is 264 Wbl over Hrt Light Rail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Is 264 Wbl over Hrt Light Rail carry?
About 57,447 vehicles per day (2022 count).
How long is Is 264 Wbl over Hrt Light Rail?
The structure is 281 ft (85.6 m) long with a longest span of 104 ft (31.7 m) and a deck 68 ft wide.
Who owns Is 264 Wbl over Hrt Light Rail?
It is owned by the State Highway Agency.