Robin Hood Road over Norfolk Wat. Supply Can
FairNorfolk city, Virginia · 0.20 to 165/ 0.30NOF Apor · Structure no. 000000000020767
- Built
- 1944
- 81 years old, rebuilt 1987
- Condition
- Fair
- inspected March 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 96 ft
- 4 main spans
- Daily traffic
- 8,409
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Robin Hood Road over Norfolk Wat. Supply Can is a concrete continuous tee beam carrying Robin Hood Road over Norfolk Wat. Supply Can in Norfolk city, Virginia. It was built in 1944 and reconstructed in 1987, so it is 81 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,409 vehicles a day, roughly 2% of them trucks, projected to reach 9,376 by 2042. The structure is 96 ft (29.3 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Robin Hood Road over Norfolk Wat. Supply Can built?
It was built in 1944, making it 81 years old in 2025. It was reconstructed in 1987.
What condition is Robin Hood Road over Norfolk Wat. Supply Can in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Robin Hood Road over Norfolk Wat. Supply Can carry?
About 8,409 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is Robin Hood Road over Norfolk Wat. Supply Can?
The structure is 96 ft (29.3 m) long with a longest span of 24 ft (7.3 m) and a deck 31 ft wide.
Who owns Robin Hood Road over Norfolk Wat. Supply Can?
It is owned by the City or Municipal Highway Agency.