US Bridges

28 Nokeville Rd. over Wellington & Railroad

Fair

Manassas city, Virginia · 01.18 Godwin 01.00 234 · Structure no. 000000000028987

Built
2012
13 years old
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
380 ft
3 main spans
Daily traffic
21,554
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

28 Nokeville Rd. over Wellington & Railroad is a steel continuous stringer/multi-beam or girder carrying 28 Nokeville Rd. over Wellington & Railroad in Manassas city, Virginia. It was built in 2012, so it is 13 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 21,554 vehicles a day, roughly 1% of them trucks, projected to reach 24,033 by 2042. The structure is 380 ft (115.8 m) long and 96 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries28 Nokeville Rd.
CrossesWellington & Railroad
Location01.18 Godwin 01.00 234
RouteState Highway 28
Coordinates38.75169, -77.49308
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 18 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating99 US tons
Inventory rating79.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length380 ft (115.8 m)
Longest span128 ft (39 m)
Deck width96 ft (29.3 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,554 (2022)
Projected traffic24,033 by 2042
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$25 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was 28 Nokeville Rd. over Wellington & Railroad built?

It was built in 2012, making it 13 years old in 2025.

What condition is 28 Nokeville Rd. over Wellington & Railroad in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does 28 Nokeville Rd. over Wellington & Railroad carry?

About 21,554 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is 28 Nokeville Rd. over Wellington & Railroad?

The structure is 380 ft (115.8 m) long with a longest span of 128 ft (39 m) and a deck 96 ft wide.

Who owns 28 Nokeville Rd. over Wellington & Railroad?

It is owned by the City or Municipal Highway Agency.