28 Nokeville Rd. over Wellington & Railroad
FairManassas city, Virginia · 01.18 Godwin 01.00 234 · Structure no. 000000000028987
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 380 ft
- 3 main spans
- Daily traffic
- 21,554
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
28 Nokeville Rd. over Wellington & Railroad is a steel continuous stringer/multi-beam or girder carrying 28 Nokeville Rd. over Wellington & Railroad in Manassas city, Virginia. It was built in 2012, so it is 13 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,554 vehicles a day, roughly 1% of them trucks, projected to reach 24,033 by 2042. The structure is 380 ft (115.8 m) long and 96 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 28 Nokeville Rd. over Wellington & Railroad built?
It was built in 2012, making it 13 years old in 2025.
What condition is 28 Nokeville Rd. over Wellington & Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does 28 Nokeville Rd. over Wellington & Railroad carry?
About 21,554 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is 28 Nokeville Rd. over Wellington & Railroad?
The structure is 380 ft (115.8 m) long with a longest span of 128 ft (39 m) and a deck 96 ft wide.
Who owns 28 Nokeville Rd. over Wellington & Railroad?
It is owned by the City or Municipal Highway Agency.